Problem:
The client needed all office equipment moved from one London site to another within a limited budget. The main challenge was ensuring zero damage to equipment during dismantling, packing, transportation and reinstallation at the new location.
Action:
Forlence first scheduled a site survey to review both locations — measuring dimensions and identifying all equipment to be moved. A van was arranged for transportation of all assets including laptops, desktops, POS terminals, routers, printers, cameras, scanners and network cabinets. Engineers dismantled everything carefully, bubble-wrapped and packed all items securely, then transported and reinstalled every device one by one at the new site.
Result:
The entire office relocation was completed within one week. All equipment was delivered and reinstalled without any damage. The client was fully satisfied with Forlence’s professional work and conveyed their best wishes to the team for their brilliant efforts.
This engagement required Forlence to carefully plan, survey, pack and reinstall a full office’s worth of IT equipment across two London locations, all within a tight budget and a one-week deadline.

Whether it's a merger or a lean pivot, scaling has never been this quick.